Design, permitting, and construction of a 1M+ GSF high-performance computing campus built for complex simulation, big data, and AI workloads.

The project replaced 56 existing UPS modules rated 750kVA / 675kW, along with their battery disconnects and cable trays, across live colocations — installing higher-efficiency double-conversion UPS modules rated 750kVA / 750kW with new battery disconnects, 2 x 600kVA PDUs, panel boards and associated feeders.
Every hour of this work happens around a running load. Switching sequences, temporary protection, outage windows, and rollback plans have to be agreed and rehearsed before a single module is de-energized, and the commercial and safety consequences of getting that wrong are immediate.

Retrofit work in live environments depends on planning discipline. Decima's project management and controls services structure the outage sequencing, method statements, risk register, and progress reporting so each switching step is approved, tracked, and reversible.
Additional project profiles with related sector, delivery, technology, or program characteristics.
Next-Gen HPC Data CenterDesign, permitting, and construction of a 1M+ GSF high-performance computing campus built for complex simulation, big data, and AI workloads.
Hyperscale Data Center — QuincyDemolition of an existing structure and construction of a two-story, 20MW+ hyperscale data center within an established campus.
Hyperscale Data Center — Boydton 20MW+A two-story, 20MW+ greenfield hyperscale data center with Tier II network, administrative building, loading dock, and multiple colocation rooms.
Connect with Decima International to discuss your program, project, or performance-assurance needs.